Residents of La Maze can now breathe a sigh of relief as they witnessed the commencement of work along their road. Over fifteen sub-contractors have been contracted to construct drains along the roadside. This is the initial works which must be done before surfacing can be done. The estimated cost is over $120,000.00.
Presently a number of projects are being carried out all over the constituency.